The city of El Paso is opposing a plan by El Paso Electric to build a power plant. This opposition is shared by other parties, although their identities are not specified. Further details about the plan and the reasons for the opposition are available from the El Paso Times.

The power plant in question is referred to as the Meta power plant. For more information on the city's stance and the ongoing situation, readers can refer to the El Paso Times article, which provides a more in-depth look at the issue.