A popular bridge has become stuck in the up position. Crews have attempted to resolve the issue, using an unusual method to try and fix the problem. They sprayed the bridge with water, apparently trying to cool it down.

The cause of the issue is related to heat. Further details about the situation are available from the source.

The bridge in question is located in downtown Chicago. More information can be found through the original report.